CPS Tuttle power plant
$0.00
Demolish Cooling Tower, Tank farm, Switch yard, Turbine House and 4 boilers with associated structures. Remove asbestos and PCB containing material from the site. Rough grade area leaving slabs in place
Quantity:
Demolish Cooling Tower, Tank farm, Switch yard, Turbine House and 4 boilers with associated structures. Remove asbestos and PCB containing material from the site. Rough grade area leaving slabs in place
Demolish Cooling Tower, Tank farm, Switch yard, Turbine House and 4 boilers with associated structures. Remove asbestos and PCB containing material from the site. Rough grade area leaving slabs in place