CPS Tuttle power plant

$0.00

Demolish Cooling Tower, Tank farm, Switch yard, Turbine House and 4 boilers with associated structures. Remove asbestos and PCB containing material from the site. Rough grade area leaving slabs in place

Quantity:
Add To Cart

Demolish Cooling Tower, Tank farm, Switch yard, Turbine House and 4 boilers with associated structures. Remove asbestos and PCB containing material from the site. Rough grade area leaving slabs in place

Demolish Cooling Tower, Tank farm, Switch yard, Turbine House and 4 boilers with associated structures. Remove asbestos and PCB containing material from the site. Rough grade area leaving slabs in place