Haynes Generating Station

Asbestos abatement, lead abatement and selective demolition work for Unit 3 Unit 4, and two large Oil Storage tanks at Haynes Generating Station (part of Los Angeles Department of Water and Power). Scope work includes abatement and disposal of TSI Pipe (40,000 lf), gaskets, for the power block, asbestos abatement from Unit 3 and 4 turbine buildings (TSI, pipes, roofing, block insulation and floor tile) insulation removal from the oil tanks. and lead paint abatement.

  • Location: Long Beach, CA

  • Total tonnage of scrap: 30,000 tons