Ferguson Power Plant

Demolish power station and associated structures, Close intake gates and remove intake piping that contains asbestos. Remove all asbestos containing material prior to demolition. Fill basement and spread topsoil over entire site. Once topsoil has been spread place hydro mulch and water until substantial growth occurred.

  • Location: Horseshoe Bay, Texas

  • Total tonnage of scrap: 13,520 tons