Tuttle power plant
Demolish Cooling Tower, Tank farm, Switch yard, Turbine House and 4 boilers with associated structures. Remove asbestos and PCB containing material from the site. Rough grade area leaving slabs in place
project location: San Antonio, TX
Total tonnage of scrap: 15,563